Ennis Town Bus scheme may result in addition of pedestrian crossing on Clon Road
DELIVERY of the Ennis Town Bus in 2025 is hoped to result in the addition of a pedestrian crossing on the Clon Road.
DELIVERY of the Ennis Town Bus in 2025 is hoped to result in the addition of a pedestrian crossing on the Clon Road.
*Photograph: John Mangan ENNIS’ public realm works recommence on Monday with appeals made for a temporary traffic management plan to be introduced to ease congestion while capacity issues at the Maid of Erin roundabout has been labelled as a contributory factor.
OMISSION FROM a Department of Transport circular is likely to hinder a Toonagh road which has cars travelling at an “unbelievable” speed from sourcing funding.
A ROSLEVAN road leading to the grounds of Avenue United FC has been declared as public.
PEDESTRIAN CONNECTIVITY needs to be increased within the village of Barefield, a senior engineer in the Ennis Municipal District has acknowledged.
*Photograph: Gary Collins “SEASONAL constraints” mean it will take twelve months before cleaning of the Corrovorrin River can take place.
*Photograph: John Mangan ADDITIONAL playgrounds are needed across Ennis and surrounding areas, elected representatives have said
*Photograph: John Mangan A COMMITMENT has been issued by the senior executive engineer in the Ennis Municipal District to meet with residents in Hermitage to discuss their frustrations over resurfacing works.
*Carmody Street. A NEW TRAFFIC signal system is to be introduced in Carmody Street based on traffic volumes rather than a time-based system.
*Hermitage residents, Michael Mahon, Brid Dinan, Caroline Ryan, Michael Kelleher and Michael Leahy. Photograph: John Mangan Photograph: John Mangan CONCERNS raised by Hermitage residents has led engineers within the Ennis Municipal District to commit to inspecting a resurfacing job completed last August.